Project Description
GNTC were delighted to have won the tiling package to complete Phase 2 of the development of Leeds Central Village which features a further 413 en-suite rooms in a magnificent 18 storey, new build tower.
Ideally located in the heart of the Leeds higher education quarter, and only 5 minutes from Leeds main shopping and leisure centres, the redevelopment is a mixture of major refurbishment and new build accommodation, transforming the former university campus site into four high quality buildings designed by the acclaimed John McAslan + Partners.
Areas Tiled
Approximately 300m2 of wall tiling to kitchen areas
and 150m2 to lobby/entrance floor
Special Details
The lobby floor required latex levelling prior to tiling to achieve a perfect finish.
Completed October 2014