Client: Ian Ball, Ereconomics
What we did: “The Great Northern Tiling Company worked with us on the refurbishment of the swimming pool at Haven’s Golden Sands holiday park in Mablethorpe. They were responsible for supplying and fitting approximately 1000m2 of tiling to the pool and changing room area using a combination of glass mosaics and porcelain tiles.
“It’s a tough job that we do every year to get the pool re-modelled between November when they shut and March when the park re-opens. Everyone has to work alongside other trades to a really tight timescale and GNTC really embraced that. They often had tilers working late shifts, which meant they’d start at dinner time and wouldn’t finish until ten o’clock at night.”
How we helped: “It’s the first time we’ve worked with GNTC but it won’t be the last. Having worked with a lot of tiling companies, I’d say about 50% aren’t up to taking on a job like this but GNTC certainly are. They embraced every challenge we threw at them and always came back to us with solutions rather than problems.”
0 Comments
Leave a reply
You must be logged in to post a comment.