Blog

  • Behind-the-Scenes @ Kids Cavern, Liverpool

    This week we’re over in Liverpool working on a huge project at Kids Cavern, a premium brand clothing store and website selling top designer children’s wear! A noteworthy aspect of this job is the fantastic combination of a number of excellent products we’ve used to achieve a fantastic result so far on these plank tiles. Featuring the Pony Levelling System, Dural Durabase Decoupling Membrane

    0
  • This Week @ GNTC – 17th September 2018

    This week could be considered as the unofficial GNTC ‘Pub Special’ as that’s where the majority of this weeks news comes from…    Starting in Scunthorpe, this week we’re beginning works at The Queensway, a Greene King franchise pub. Here we’re going to be installing a new back bar and bar walk – a total of 27m2 of floor and wall tiling.

    0
  • Behind-the-Scenes @ The Barrel Vault, St. Pancras Station.

    At this point we may be talking your ear off about The Barrel Vault in St. Pancras but that’s been to build up the hype for another batch of behind-the-scenes photos from our lads down there on-site…   ” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]     

    0
  • This Week @ GNTC – 10th September 2018

    This week we’re bringing another huge batch of completed projects and behind-the-scenes photos to you from job sites all over the country. However lets start off with a couple of new, exciting jobs that we’ll be beginning works on this week…   …A new contract at Victoria’s Secret. Located in the Metro Centre, Gateshead, our lads will be installing 679m2 of floor

    0
  • Behind-the-Scenes @ Las Iguanas, O2 Arena, London

    Fresh from the site at Las Iguanas in the O2 arena, our tilers have shared some in-progress photos from a very vibrant work location!    ” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

    0