GNTC are pleased to announce they have won the tiling package for the Arnold Leisure Centre in Nottinghamshire. Tiled floor and wall areas comprise over 1000m2 to changing rooms and pool areas. We start on site mid March. Posted byDarren Nockall January 27, 2014 2 Share: Related Articles Work’s started at Café Rouge in the UK’s 5th Center Parc…. Pole position at the F1 Autocentre in Bristol…. GNTC are keeping cool this September GNTC’s catch of the day! Dior 4 x 4…. Dior, Conduit Street, London